Log on to environdec

Railway tunnels on the Botnia Line

  • S-P-00197 Image 1.JPG

Product information

This environmental product declaration (EPD) describes, from a lifecycle perspective, the total environmental impact of railway tunnels on the Bothnia Line. The EPD covers tunnel "substructure" only. Track, power, signalling and telecom systems in the tunnels are not included.

The aim of this EPD is that it should provide experts and scientists (in the construction and infrastructure sectors) with objective and reliable information on the environmental impact of constructing, operating and maintaining railway tunnels.

Detailed information

Registration No: S-P-00197
Registration date: 2010-03-19
Version date: 2014-11-06
Valid until: 2017-11-06
Verified by: Bureau Veritas Certification Sverige AB
Reference PCR(s): Railways (expired 2016-10-18; being updated)
Geographical scope: Sweden

Company information

Swedish Transport Administration (Trafikverket)
Company name: Swedish Transport Administration (Trafikverket)
Country: Sweden
Telephone: 0771-921 921
Website: www.botniabanan.se

More Epd's from Swedish Transport Administration (Trafikverket)