Log on to environdec

Railway bridges on the Botnia Line

  • S-P-00199 Image 1.JPG

Product information

This environmental product declaration (EPD) describes, from a lifecycle perspective, the total environmental impact of railway bridges on the Bothnia Line. The EPD covers bridge "substructure" only. Track, power, signalling and telecom systems on the bridges are not included.

The aim of this EPD is that it should provide experts and scientists (in the construction and infrastructure sectors) with objective and reliable information on the environmental impact of constructing, operating and maintaining railway bridges.

Detailed information

Registration No: S-P-00199
Registration date: 2010-03-19
Valid until: 2013-03-19
Verified by: Bureau Veritas Certification Sverige AB
Reference PCR(s): Rail infrastructure and rail transports (de-registered)

Company information

Swedish Transport Administration (Trafikverket)
Company name: Swedish Transport Administration (Trafikverket)
Country: Sweden
Contact: Malin Kotake
Telephone: 0771-921 921
Website: www.botniabanan.se

More Epd's from Swedish Transport Administration (Trafikverket)

Download Documents