Log on to environdec

Comment this PCR

Bridges, elevated highways and tunnels (under development)

Initiated

2016-05-02

Start open consultation

2016-11-01

Deadline open consultation

2017-01-01

PCR review and approval

2017-10-01

Publication

2017-11-01

Preliminary dates are in italics

PCR information

This PCR has been initiated to replace the existing PCR for bridges and elevated highways, and to extend the scope to tunnels.

A draft version was available for open consultaiton until 2017-01-01. The draft will now be updated, and reviewed before publication.

The draft and a template for comments is available on the right side of this page. A free login must be created if this is your first visit.

Dates are preliminary.

Detailed information

Replacing : PCR 2013:23 Bridges and elevated highways (expired 2016-12-20; being replaced)
Name: Bridges, elevated highways and tunnels (under development)
CPC Code(s):53221 Bridges and elevated highways
53222 Tunnels
GPI version: General Programme Instructions 2 (2013-)
Based on: Basic Module: Constructions
Related PCR(s): Railways (expired 2016-10-18; being updated)
Highways (except elevated highways), streets and roads (expired 2016-10-18; being updated)
Valid location(s): Global
Prepared by: R.T.I. NIER Ingegneria SpA, LCA-lab srl, ANAS S.p.A.
PCR moderator(s): Francesca Falconi  LCA–lab srl

Comments on this PCR

  • Be the first discussing this PCR
Start a discussion