Log on to environdec

PCR Forum

Asphalt mixtures (under development)

Tarmac Considerations

by: helen atkins (helenatkins) 03 July 2017, 12:58:30 PM (GMT +1)

We at Tarmac agree with the general proposals set out in this consultation and are in broad agreement of the system boundary and upstream and downstream processes. In regards to RSL service life we recognise the default of 40years and considerations of 30years, is this possible to breakdown further?

At Tarmac, we have released 2 verified asphalt EPD with all modules declared. We note that use stage B5-B7 is MND, is there consideration to be made as whether an assumption is made as we have done in our EPD?

We are happy to share our asphalt EPD if it would be of benefit to you?

Regards, Helen Atkins (Sustainability Advisor, Tarmac)

0 Posts Page 1 of 0

Answer