EPD-IES-0025904:002

PT PLN Indonesia Power UBP Mrica Unit PLTA Wonogiri

PT PLN Indonesia Power UBP Mrica Unit PLTA Wonogiri is a hydropower plant with a capacity of 2 x 6.5 MW. Located in Wonogiri, Central Java, Indonesia, Wonogiri Hydroelectric Power Plant (PLTA) plant utilizes water from the Bengawan Solo River as its primary resource, converting the energy of water flow into electricity. The upstream process encompasses raw material acquisition and production, transportation of operational materials, and electricity generation at third party (PLN Java-Madura-Bali (Jamali) Grid). In addition, the infrastructure in the upstream process was taken into account. The core process focuses on electricity production and operational activities at PT PLN Indonesia Power Unit PLTA Wonogiri, including the waste treatment and transporation of waste. This core stage also include the construction, decommissioning, and reinvestment of the hydropower infrastructure (e.g., turbines, generators, dams, and buildings). Meanwhile, the downstream process involves the distribution of electricity to customers, as well as the corresponding electricity losses. This stage also includes the construction, reinvestment, and decommissioning of the distribution infrastructure.

Registration numberEPD-IES-0025904:002
PCR2007:08 Electricity, steam and hot/cold water generation and distribution 5.0.0
StatusValid
Publication date2025-10-06
Valid until2030-10-01
EN 15804 compliantNo
Geographical scopeIndonesia