EPD-IES-0026694:001
Project Stockland Momenta GS322AP3 (32MPa Greenstar 3) concrete
Ready-Mixed Concrete supplied to Hindmarsh Constructions for the construction of the Stockland Momenta logistics facility.
The products outlined in this EPD are manufactured at Gunlake’s Banksmeadow plant in Sydney, NSW. The concrete is used in the construction of the Stockland Momenta logistics facility located at 2-8 Baker St, Banksmeadow.
| Registration number | EPD-IES-0026694:001 |
|---|---|
| Status | Valid |
| Initial version date | 2025-11-28 |
| Validity date | 2030-11-27 |
| PCR | 2019:14 Construction products (EN 15804+A2) (version 2.0.1) 2.0.1 |
| c-PCR | 2019:14-c-PCR-003 Being updated - Concrete and concrete elements (EN 16757) 1.0.0 |
| Standards conformance | ISO 14025:2006, EN 15804:2012+A2:2019/AC:2021 |
| Licensee | EPD-Australasia |
| Geographical scope | Australia |
| LCA Practitioner | Rob Rouwette |