EPD-IES-0026696:001

Project Stockland Momenta GS22@4ABP2 (40MPa 22@4 Greenstar 2) concrete

Ready-Mixed Concrete supplied to Hindmarsh Constructions for the construction of the Stockland Momenta logistics facility.

The products outlined in this EPD are manufactured at Gunlake’s Banksmeadow plant in Sydney, NSW. The concrete is used in the construction of the Stockland Momenta logistics facility located at 2-8 Baker St, Banksmeadow.

Registration numberEPD-IES-0026696:001
StatusValid
Initial version date2025-11-28
Validity date2030-11-27
PCR2019:14 Construction products (EN 15804+A2) (version 2.0.1) 2.0.1
c-PCR2019:14-c-PCR-003 Being updated - Concrete and concrete elements (EN 16757) 1.0.0
Standards conformanceISO 14025:2006, EN 15804:2012+A2:2019/AC:2021
LicenseeEPD-Australasia
Geographical scopeAustralia
LCA PractitionerRob Rouwette